Adam ceiling, smoking room

While the glue is setting on my grand stairs, I decided to continue my project of making new ceilings using Adam paper. It is not without trepidation I approached this task because, unlike the Grand Hall that didn't have any ceiling decoration (and was hard enough), in order to insert new ceilings in existing, assembled rooms I will need to perform the following operations:
1) remove all objects from the room I will be working on
2) remove coving (in this situation, I am glad that I use paper rather than wood)
3) remove existing ceiling paper or decoration
4) remove flooring in the room above (which may involve removing skirting) to access fixture for ceiling light
5) remove ceiling light
6) glue new ceiling paper onto a piece of lining, making sure that the new ceiling rose is aligned with the existing hole for the ceiling light (this may also involve cutting and pasting, to assemble a new pattern, as I had to do with the ceiling in Grand Hall)
7) glue new ceiling assembly onto the ceiling - working upside down in a small room. For this step you should preferably be an octopus
8) fix the ceiling light, feeding the wire through the hole up to the room above
9) replace flooring in the room above, including skirting
10) insert new coving in the room I am working on
11) put all objects back into the room

If you wonder why I bother it's because I am a perfectionist. Now that I have this magnificent paper I am no longer satisfied with my old ceilings.

I started with the smoking room for no particular reason; probably because the old ceiling was slightly damaged when we did the lights. 

I will not show step-by-step pictures because, apart from being tremendously difficult, it was straightforward (except that it was painful to see the room stripped down again). The only unforeseen trouble was that in a corner there was a wire connector that my son-in-law would have been able to remove and re-connect, but I didn't dare, so I had to cut a little square. Unless you look closely you won't notice. Here is the result:


It took me three hours, but luckily I didn't have to tear up the room above because I still have paper floors there which could be carefully lifted.

With objects put back:




Having lights inside the room was a huge advantage, although otherwise it would have made sense to fix the ceiling before the lights. But I didn't have much choice.


Saturday, 12 December 2015

Last floor

I have been postponing this floor as long as I could, but the time has come: I need to build the stairs and railing, and generally it's time to finish major work now that I have lights and all. The reason I have been postponing this project is that it is a lot of work, but it is good when you need a calm day with yourself. It is precision work that needs concentration.

When I started planning Womble Hall I knew that the floor in the upper hall would be the floor from my former art gallery. Most objects from the art gallery are now in Womble Hall, not just pictures and statues, but also fireplace. So the floor would be moved to upper hall. Obviously, it wouldn't be enough because in the art gallery it was a small surface. At that time, I wasn't sure I had the patience to make a whole floor like this. Now I am sure. For the hall, I needed to add quite a few squares.


This picture was taken a year ago - this is how long it took me to finish this floor. It soon became clear that I didn't have enough cheese boxes, but on the other hand, I had plenty of coffee stirrers that are much easier to work with, and reluctantly, I discarded the old floor and started anew.

Some time ago when I shared the project on Facebook someone asked me about the size of the squares. So here is for size. These squares are smaller than in the art gallery because I use coffee stirrers. 


I will not show step-by-step pictures because technically there is nothing special about it: just measure, cut, assemble the pattern, glue, repeat... again and again. It didn't literally take me a year, because I made many other things at the same time, but I estimate that it took me about 50 hours. I would make a row every now and then. But today I finished it!



Please agree that it was worth the trouble. There are still some small tasks I need to do before I glue together the railing, but I have assembled it temporarily, just to see what it looks like. I like what I see.



I will now be able to insert the side doors (if you have followed my blog you now how much I hate it), finish the walls and ceiling decoration, attach the chandelier, and so on. The lights make it much easier to work inside the rooms than with a lamp. And easier to take pictures.

I have almost run out of coffee stirrers - I bought a pack of thousand when I started with new floors in the house. This sets everything in perspective.

Sunday, 6 December 2015

Newcomers from Maple Street

Yesterday I was tempted to visit the most dangerous shop in the UK, Maple Street. I have written about it before. From the outside, you would never guess what an Ali Baba cave it is. It looks like a shabby warehouse. It is actually a warehouse as the shop mostly sells online, but it is overwhelming when you step inside. I didn't need anything in particular, but I can never leave this shop without buying something. First of all, I found this:


A mini vacuum cleaner to get rid of all dust and sawdust in the remotest corners of the dollhouse. It is meant for keyboards and other devices, but wasn't it clever of the shop to sell it to miniaturists! Warmly recommended. I had wanted something like this for a long time.

I also bought a harp for my music room. It was exceptionally cheap, and it fits in nicely.


But my best bargain was three lovely dolls. I believe they are handmade, as they don't look like any dolls I have seen in ordinary shops. They were lying in a heap, without boxes, and some were broken.

 

I like this gentleman's face. His posture suggests he is old and tired.


 

I wasn't sure where this lady would be best placed, but she ended up in the guest bedroom where her husband has already gone to bed in his bathrobe. Although he should probably sit in his armchair by the fire and have a smoke.




This pretty lady had no hands and was just a third of original price. Buying her, I was sure I would be able to mend her, but not sure how. I am not good with clay or fimo which might be the most natural way. So instead I took arms from a broken plastic doll whom I had never used in any project, since she turned out to be wrong scale. The hands were slightly too large and look more like baby hands than lady hands, but I hoped they wouldn't be too conspicuous. It felt creepy to work with severed arms, and they were also too tanned for my pale-faced lady, but I painted them in a paler tone:

 

I also put a diamond ring and an emerald ring on them. 

So the lady is not a cripple anymore.


The other inhabitants of the house are excited about the newcomers. I am sure there will be many parties this holiday season.




Wednesday, 2 December 2015

New phase in lighting, technicalities explained

I have received several questions from my miniature groups about how exactly LED strips work and how we did the lighting. I can again refer to my very first attempt with LED strips, but I can also try to explain the technical bit of it in a non-technical language, just as my son-in-law explained it to me as we were working together.

To reiterate: I had been looking for easier ways of lighting than the traditional wiring, and my youngest son, who is a filmmaker and knows everything about light, suggested LEDs. Actually, he first suggested smart-touch spots, which I used in a roombox. But you cannot easily hide rather large kitchen spots in a dollhouse so it wasn't a universal solution. His next idea was LED strips, and that's when I bought the 5 meter long strip with transformer that you can find in many varieties on ebay. You can also find instructions on how to fix them on Youtube, and as all instruction videos on Youtube it looks very simple until you try. LED strips are primarily used to install under kitchen wall units, which is so straightforward that I believe even I could do it. To make the desirable length, you cut the strip in indicated places and insert into a snap connector provided with the transformer. (Am I sufficiently non-technical?)

It becomes slightly more complicated if you need to divide a strip between two or more units, because then you need to cut it and use a bit of wire to lead from one strip to the next. To do so, you need double snap connectors that look like this:

 

The idea is that when you have cut your strip you insert it into a connector and snap it. It took me a few ebay purchases before I got it right. They aren't expensive. I had everything prepared for P's visit, including a dimmer on remote control that didn't work, but it's another story. But P is a perfectionist, so rather than using the snaps he decided to solder the wires directly onto the strips. He used the wires from snap connectors.


So: first he cut the LED strip to fit the breadth of a room. You see very clearly where you can cut, and there are also clear marks of + and -. The wire is bi-coloured so you also know where + and - are. I remember it all vaguely from school physics.

Next he did some magic with the soldering iron that I cannot describe with words, but that you can see in the picture.



I know it's not very helpful, but if you, like me, aren't too confident with soldering you can use the snap connectors. We used two before P decided that it wasn't neat enough for him, but I was perfectly satisfied. The trick is to hide the lights behind something, for instance, a beam or moulding, and then you can just as well hide the snaps. P used a number of snaps of a different format, that he had brought with him, to make connection between floors. This was for several reasons. First, he argued, if I ever wanted to change something it would be easier to disconnect one snap than dismount the whole system. I am sure I will never want to change anything, but he might, because he has already tons of ideas for future development. Second, when we led the wires on the outside we needed to pull them through drinking straws disguised as drain pipes (see previous blog post), and this could only be done if the wires can be disconnected at every floor. Between floors, where the original wires were not long enough, P used bell wire. He told me to specify in this post that bell wire is the right wire to use for this kind of work. However, it wasn't bi-coloured so P had to check it all the time for + and - with a little gadget he had on him, and this is beyond my comprehension.

To sum up: there are seventeen rooms in the house, so there are seventeen strips of various length, all cut from the original 5 meters and connected with soldered wires. The whole strip-wire assembly uses one single transformer, which means that all lights are switched on and off together. A dimmer will be inserted later, if necessary. It is technically possible - and that's P's next project - to make every strip work independently with remote control or even from a computer through wi-fi. Since he has helped me, I feel I will have to allow him to play as much as he wants with my dollhouse, although I am absolutely happy the way it is.

As I have also described before, in my rear corridors I have used short LED strips that are battery-powered.  I have six of these, and at the moment I can only switch them on manually and individually, but P is determined to connect them too and put on remote. He also has ideas about single LED lights for chandeliers and table lamps, as well as light-sensitive LEDs that will switch on automatically when it gets dark. It's not magic - he has all this stuff in his 1:1 house. I promise to share when we get there.

Here is one of the pictures that P took when he saw that the light was good.




Monday, 30 November 2015

New phase in lighting, cont

Here is the next installment of the LED lighting project.

This picture shows how all LED strips are being connected.


To remind you: I had a 5 meter-long LED strip (from ebay) that had to be cut to measure and then reconnected with wire that could go in notches between rooms. I had bought snap connectors, but my son-in-law thought they weren't neat enough so he soldered every connection! And he wasn't at all impressed that I had a soldering iron, as if it's something any household would own.

After we finished the basement, we led out the wire through the right top corner on the outside. Then P prepared the three connected strips: two with three strips for three rooms and one with four strips for four rooms on top floor.

 

Meanwhile I drilled holes, made notches and did other menial work. All the time we checked that the whole assembly worked.


Once we were sure that everything worked, we started attaching the strips to L-shaped plastic mouldings which we then glued on the edges of each ceiling and supported with masking tape. In this picture, two floors are finished and top floor still waiting. As you can see, the rooms are in complete chaos.


There were lots of small unexpected problems, but we dealt with all of them. The connecting wires between floors go on the outside, and after some thinking we decided to hide them within drain pipes:


These are of course drinking straws, and they will run all the way, and nobody will ever guess that they weren't part of the original design.

Yesterday evening we switched on the lights in the three floors and basement.



We saw that the light was good. We opened the fronts.



Then we went to bed, not sure that we would have time to do the attic. I hadn't even planned to do the attic because I didn't think the LED strip would be enough. But because of the wires between the cut strips, the 5 meters turned out to be just enough for the attic.



With the roof open:



As you see, the tape is still there, and there is A LOT of trimming to do, filling and painting seams and notches. But on the whole, we saw that the light was good.

Just two rooms where I've had the time to tidy up a bit. Servant room in the attic:


 

 And finally, warmest season's greetings from the reception room:






Sunday, 29 November 2015

New phase in lighting

My clever son-in-law is visiting, and we have started working on our project of fixing display lights in the house. Display lights are lights that you can switch on to illuminate every little detail in your house, even at the back of the rooms. This is how dollhouses are displayed in museums: there may be "real" lights inside rooms to create atmosphere, but there are also lights that provide soft, even illumination for the best viewing effect. Display lights can be dimmed to the desired brightness.

Quite a long time ago I decided that I didn't want conventional lights in Womble Hall, because they are so much trouble, and you can typically not have more than twenty bulbs on one transformer. I had conventional lights in my first dollhouse, and after that I never want anything to do with them. These days there are many better solutions. One is battery lights which I thought were great when they came: no wiring, can be placed anywhere. But the first generation battery lights were very dim and very expensive. They are better now but still expensive. They can be used as complement to main lighting, but not on their own. 

My solution, after lengthy conversation with my film-making son, is LED strips. I am not good with electricity, but together we came up with a possible layout. The LED strip is 5 meters long and should be enough for the main floors and basement. It will be hidden behind moulding, for smooth and even light. However, between rooms it will need to be cut and connected with wire. (This is what I would never dare try on my own).

I had bought snap connectors recommended for under-cabinet kitchen lighting. But P tried and said it wasn't neat enough. Instead he insisted that he would solder the wires. I didn't object because I know he is enjoying this kind of play. So P is doing the cutting and soldering. I am very proud that I own a soldering iron, although I have only used it once.


Meanwhile, I made a groove in the wall for the wires (where the arrow is). It doesn't look very neat right now, but I will fill and paint it when everything is done.


Then we had to make some major decisions about whether the cord should go: on the inside or outside. For some reason I hadn't considered having it outside and had been pondering how to conceal it along the kitchen ceiling. I had even drilled a hole in the back wall. But suddenly it became clear that it was much less disturbing on the outside where I could simply cover it with plaster or make a draining pipe. I will still have to fill that hole, but I drilled another one to pull through the cord, and then we started fixing the strips. They have a self-adhesive surface, and I fixed them on the inside of the L-shaped moulding, facing the back wall. You see also how the connecting wire goes into the groove.


We managed to finish the basement yesterday. The glue was left to dry overnight, supported by masking tape. But you can already see the effect.


In the morning, I filled the grooves and the seems. They are still drying, but I will paint them later.



Then, while P went on soldering for the other floors, I worked on the main cord. It goes out in the upper left corner of the basement, and it doesn't look neat that way.


Therefore I fixed it all the way to the back of the house. It almost looks like part of the drainage system so maybe I will just leave it like that, or probably paint black. 



We hope to finish the whole project by tomorrow afternoon. Come back!



Monday, 23 November 2015

Grand Adam ceiling, cont.

As planned, I finished the Adam ceiling today. I cannot say I am fully content with the result, because, as I keep saying, it is incredibly difficult to work on a ceiling once the house has been assembled. If there are minor faults (yes, there are) there is nothing I can do about them now, and most probably nobody will ever notice, except maybe someone inspecting the house closely when I am gone, and I won't worry about it now. Unless yo look very carefully, it looks good.


 

The magnificent silver chandelier from the antique shop in Stockholm is so far attached provisionally because first I need to attach the stairs. As I was working on the ceiling I noticed that I hadn't finished mouldings on the back wall, so I will need to do that before I attach the stairs. However, with the ceiling I feel there is a major break-through in the hall. I am glad I haven't yet attached the stairs because then the ceiling would have been impossible to fix. This was simply meant to happen this way.