Dollhouse escapes

Making dollhouses, room boxes and miniatures for fun and relaxation

Wednesday, 1 April 2015

Rear corridor

›
I skipped a step prescribed by assembly instructions and started looking closely at the second-floor rear corridor. This is a very interesti...
Monday, 30 March 2015

Guest bedroom

›
The last "easy" room is the guest bedroom, which is on top floor, to the right. The side walls were already decorated so I just ne...
2 comments:
Sunday, 29 March 2015

Bedroom ceiling and top floor

›
The last ceiling I had to decorate before putting in the top floor was master bedroom. For the study, that is on the same floor, I decorated...
1 comment:
Saturday, 28 March 2015

Second floor and drawing room

›
Now that I had finished the pink ceiling , I could put in the second floor. I will not describe the process because it would mostly consist ...
Tuesday, 24 March 2015

Pink ceiling

›
When I couldn't postpone it any longer, I put in the first floor. I had to sand edges for ever and ever, and then I tried it without glu...
Sunday, 15 March 2015

Chimney

›
A very quick side project.   I used a wooden block onto which I glued brick paper, aged with shoe polish. The edges are bits of rail, t...
1 comment:

Trimming edges

›
Remarkably, as long as the house was only temporarily assembled, I didn't even notice all the untidy edges and corners - they were all, ...
1 comment:
‹
›
Home
View web version
Powered by Blogger.